Oaklands Community Pool Solar Installation

oaklands-communuty-pool-solar-install-by-powerforce-renewables-southamption.jpg

2025

Supporting Oaklands Community Pool in Southampton to reduce energy bills and carbon usage.

Powerforce Renewables has successfully completed a commercial solar PV installation at Oaklands Community Pool, offering a sustainable, cost saving energy solution for the facility. This project highlights our commitment to delivering high-quality renewable energy systems that are customised to meet the unique requirements of our commercial clients.

Oaklands Community Pool, located in Southampton, is a charity-driven facility dedicated to promoting health and well-being in the local community. Offering a variety of swimming activities and programs, the pool provides a valuable resource for residents of all ages. As a charitable organisation, Oaklands Community Pool is committed to sustainability, exemplified by its recent solar PV installation to reduce both energy costs and environmental impact.

Project aim

Solar Project Objectives

The main objective of the installation was to reduce electricity bills for Oaklands Community Pool through the use of a sustainable, green energy solution. By harnessing solar power, the solar system helps lower operational costs while supporting the facility’s commitment to environmental responsibility.

Oaklands Community Pool solar install process

The Solution

The solution provided for Oaklands Community Pool consists of a 49kWp solar PV system, utilising high-efficiency 480W Jinko modules to maximise energy generation. The system incorporates Solaredge technology, which optimises the performance of each individual panel, ensuring enhanced energy output and greater reliability.

We managed the project from start to finish. This included G99 applications as well as sourcing the panels, and arranging to install of scaffolding with MAC Access Scaffolding. The install took 7 days to complete.

Project solution
Screenshot

Main Aspects & Components

Annual Production: 45.41MWh

Components: Jinko Solar Panels | Solaredge Inverters | Solaredge Optimisers | G99 Panel | Firefighter Gateway

Savings from solar

The Results

CO2 Savings: 8.78t

Annual Savings: £9102

Want more info about our commercial solar installation services? 